New Buck Corporation 85 installation instructions Final Check

Models: 85

1 39
Download 39 pages 56.5 Kb
Page 30
Image 30
Manual background

(a)Chimney pipe is 3' higher than roof at the point where it penetrates the roof.

(b)Chimney pipe height is at least 2' higher than any part of the roof within 10' of the chimney. (See Figure 12.)

4.Next, install a New Buck Corporation chimney connector to the flue of the heater or use 3 “Ell” brackets and secure to the top of the heater and pipe.

5.Using single wall chimney connector, connect the heater to the chimney by following manufacturer’s installation instructions exactly. (See Figure 13.)

Manual background CEILING SUPPORT BOX

CHIMNEY CONNECTOR

SINGLE WALL PIPE

 

Figure 13

FINAL CHECK

1.Recheck the specified clearances.

2.Remove all foreign material from the firebox area.

3.Open the primary air draft.

NOTE: Plug the power cord into a 115V AC outlet. Set switch to “Manual” and rheostat to “High” position to ensure motor operates properly. Route the cord to prevent damage to the cord insulation from heat and sharp objects. Keep the cord out of the way of traffic to prevent

28

Page 30
Image 30
New Buck Corporation 85 installation instructions Final Check