5.Next, remove the four (4) screws holding the heater to the stand. Position heater out of the way of the installation area.

5.Next, remove the four (4) screws holding the heater to the stand. Position heater out of the way of the installation area.

6.Check that the pedestal stand is still aligned with the marks and now, mark the outside air opening of the stand on the pad.

7.Next, mark the center line of the outside air opening. Set stand aside for now.

8.Next, cut a 4 1/4" diameter hole in the pad and continue through the floor.

9.Now, reposition the pedestal stand and set on the pad being sure to line the stand up with the reference marks.

10.Using an electric drill and 3/8" masonry bit, drill four (4) holes in the protective pad using the holes in the bottom side lips of the pedestal stand as a guide. Be careful to drill only through the pad and not into the floor. Change the bit to a 1/4" metal bit and drill through the floor.

11.Using four (4) 3/8" x 1-1/2" lag bolts, secure the pedestal stand and pad to the floor of the mobile home.

12.Set the heater back onto the stand and resecure using the screws.

13.Obtain the outside air duct from the box in the pedestal kit marked FA P21B.

14.From under the mobile home, slip the duct up through the 4-1/4" hole. Push up until the face of the outside air duct contacts the underside of the floor of the mobile home. For certain floor thickness, you may have to shorten the length of the outside air duct.

15.Secure the outside air duct to the floor using the four (4) #10 x 1" screws provided. See Figure 12.