INSTALLATION
Warning!
Only qualified service personnel or system installers should make all rack mountings, connections or internal settings. If adjustments are required, please refer to the Service Manual available for this product.
■Mounting in the Rack
Rubber feet
Remove the four rubber feet by removing the four screws from the bottom of the
●Mounting One WJ-MP204C with the WV-Q204/1
1.Fix the mounting brackets (large and small) on both
sides of the
Rack mounting bracket (small)
●Mounting two WJ-MP204Cs with the WV-Q204/2
1.Place the joint metals on the
Note: Remove the two screws from the rear of each
Rack mounting bracket (small)
2. Install the
Cautions:
•Do not block the ventilation opening or slots in the cover to prevent the appliance from overheating. Always keep the temperature in the rack within +45°C (113°F).
•Secure the rear of the appliance to the rack by using additional mounting brackets (procured locally), if the rack is subject to vibration.
•Do not use tapping screws for installing the WJ- MP204C on the rack with the rack mounting brackets.
Rack mounting bracket (large)
Joint metal | Remove 2 screws from |
| the rear beforehand. |
Mount screw Binding head (M3x8)
Rack mounting bracket (small)
Mount screw
Flat head (M3x6)
Rack mounting screws
9