MACH® Series | Installation |
|
|
3.Smoothly close the downstream manual isolation valve to reduce the gas flow and cause flame failure.
4The display will flash
After completing this test, turn off the boiler and open the downstream manual isolation valve.
3.11.2 Test of Low Water Cut-out
The boiler is furnished with a
Operation of the switch can be checked by first turning the boiler off, and then turning the system pump off. Isolate the boiler from the system pressure. After isolating the system, drain the water level below the low water
Return the system to normal operation and restart the boiler. Refer to Section 4.2.1.
3.11.3 Test of High-Limit Control
Fire the boiler and test the high limit control as follows:
With the main burner operating, turn down the temperature setting on the
3.11.4 Test of Gas Pressure Switch
Low Gas Pressure Switch
The boiler is furnished with a low gas pressure switch. The operation of this switch must be checked by slowly closing the main gas cock while the burner is operating. The switch should shut down the main
burner. When the gas pressure switch opens, a manual reset lockout displaying E 12 on the display panel will occur. Upon
High Gas Pressure Switch
C450 units equipped with a high pressure switch must be checked by closing the downstream gas cock while the burner is operating. The switch should shut down the main burner. When the gas pressure switch opens, a manual reset lockout displaying E 12 on the display panel will occur. Upon
C750,C900 and C1050 units equipped with a high pressure switch must be checked by closing the downstream gas cock with the boiler off. When the boiler is starte , it should enter its normal starting cycle and fail on high gas pressure when the gas safety valves open. The high gas pressure switch actuation is evident when a manual reset lockout displaying E 12 on the display panel occurs. Upon
Page 19