3.7.1 Gas Supply Piping by Installer

 

MACH® Series Gas-Fired Boiler

 

 

 

 

 

Installation

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Pipe Capacity for Natural Gas

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Nominal

 

Equivalent Pipe Length

Maximum Capacity in Cubic Feet of Natural Gas per Hour

 

 

Iron Pipe

Internal

 

 

Pressure Drop of 0.5 inch Water Column/Equivalent Length of Pipe

 

 

Size

Diameter

 

 

 

 

 

(in feet)

 

 

 

 

 

90º Ell

Tee

 

 

 

 

 

 

 

 

 

(Inches)

(Inches)

 

 

 

 

 

 

 

 

 

(Feet)

(Feet)

20

40

60

80

100

150

200

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1/2

0.622

1.55

3.1

120

82

66

57

50

40

35

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3/4

0.824

2.06

4.12

250

170

138

118

103

84

72

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

1.049

2.62

5.24

465

320

260

220

195

160

135

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1- 1/4

1.380

3.45

6.9

950

660

530

460

400

325

280

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1- 1/2

1.610

4.02

8.04

1460

990

810

690

620

500

430

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

2.067

5.17

10.3

2750

1900

1520

1300

1150

950

800

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2- 1/2

2.469

6.16

12.3

4350

3000

2400

2050

1850

1500

1280

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3

3.068

7.67

15.3

7700

5300

4300

3700

3250

2650

2280

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4

4.026

10.1

20.2

15800

10900

8800

7500

6700

5500

4600

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3.7.1 Gas Supply Piping by Installer

The boiler and all gas piping connections should be pressure-tested and must be checked for leaks before being placed into service. Test with compressed air or inert gas if possible.

3.8BOILER WATER PIPING

3.8.1 Piping Design

Water Flow in System

The boiler must be disconnected at the boiler manual shut-off valve (located at the end of the supplied gas train) from the gas supply piping system during any pressure testing of the system at pressures in excess of 1/2 psig (14" W.C.).

During any pressure testing of the gas supply piping system at pressures equal to or less than 1/2 psig (14" W.C.), the boiler should be isolated from the gas supply piping system by closing the manual shut-off.

Some leak test solutions, including soap and water, may cause corrosion. These solutions should be rinsed-off with water after testing.

For proper water flow requirements see below. Incorrect flow may result in eventual damage or premature failure of the equipment.

Model

Max Flow

Min Flow

DP ft. at

 

GPM

GPM

max flow

 

 

 

 

1050

105

52

12

 

 

 

 

900

90

45

12

 

 

 

 

750

75

37

12

 

 

 

 

450

45

22

8.5

 

 

 

 

300

30

15

8.5

 

 

 

 

Contact factory for minimum flow at other than maximum firing rate.