Door Frame Sectioning—Outer (Rocker Sectioning) Installation Procedure con't

6.Prepare all attachment surfaces as necessary.

7.Apply weld-thru primer to all bare- metal surfaces.

8.Fit the backing plate (1) halfway into the sectioning joint (2). Clamp and plug weld to the vehicle.

9.Align the Rocker Panel using three- dimensional measuring equipment.

10.Plug weld accordingly.

11.To create a solid weld with minimum heat distortion, make 25 mm (1 in.) stitch welds along the seam with 25 mm (1 in.) gaps between them. Then go back and complete the stitch weld.

IMPORTANT: Prior to refinishing, refer to publication GM4901M-D-01 GM Approved Refinish Materials for recommended products. Do not combine paint systems. Refer to paint manufacturer’s recommendations.

12.Clean and prepare all welded surfaces.

13.Apply the following as necessary:

Anti-corrosion materials

Sound deadeners (1)

Sealers

14.Refinish as necessay.

15.Install all related panels and components.

25MM (1 IN)

2

1

1

1

1

1-282001 Pontiac Aztek

Page 28
Image 28
Pontiac 2001 manual 25MM 1