Quadra-Fire 7051-158B Edge 60 Pellet Fireplace Finishing Material, Flush with the Mounting Frame

Models: 7051-158B

1 58
Download 58 pages 35.93 Kb
Page 29
Image 29

R

EDGE 60 Pellet Fireplace

F. Finishing Material

2.Flush with the Mounting Frame

NOTICE: Non-combustible material is not needed to fi nish this appliance.

It is important that the fi nishing material is determined before the appliance is secured to the fl oor. Depending on the fi n- ishing material and installation method, the appliance may need to be positioned further in or out of the wall.

There are three ways fi nishing material can be applied:.

1.Behind the mounting frame

2.Flush with the mounting frame

3.Protrudes beyond the mounting frame

1.Behind the Mounting Frame

The mounting frame is designed to have a 1/2 inch (13mm) overlap on the sides and the top of the framing opening.

Figure 28.1.

Finishing Material Behind

the Mounting Frame

Mounting Frame

Figure 28.1.

Positioning the nailing fl anges:

Slide the nailing fl anges all the way to the front and this will set the appliance for 1/2 inch (13mm) sheet rock.

If tile, marble or other fl at surface fi nish material is desi- ered and you want the mounting frame to cover the cut edge, set the nailing fl anges at a dimension of the sheet rock thickness plus the fi nishing material thickness.

Figure 28.2.

Example: Sheetrock = 1/2 inch (13mm)

Finish Material = 3/8 inch (9.5mm)

Move fl ange: 7/8 inch (22.5mm)

Front of Fireplace

 

Adjustment Screw

7/8 in

 

 

(22.5mm)

Adjustable Nailing Flange

 

Figure 28.2

The fi nish material can not be thicker than 1-1/2 inches (38mm) to use this method. Figure 28.3.

Set the nailing fl anges for sheet rock thickness and install the appliance.

Install the mounting frame.

Install the fi nishing material to edge of the mounting frame.

Finishing Material Flush with Mounting Frame

Mounting Frame

Figure 28.3.

3.Protrudes Beyond the Mounting Frame

This method is mainly used for a brick or stone installa- tion. When fi nishing material is protrudes of the mounting frame and front, there must be a 1-1/4 inch (32mm) airfl ow clearance in front of the mounting frame. Figure 28.4.

Finishing Material Beyond Door Frame

Masonry Spacer

Door Frame

Maintain 1-1/4 inch (32mm) air clearance in front of door frame

Figure 28.4.

Use the masonry spacer supplied with the Front to position the fi nishing material at the proper dimension. Remember to keep the Front opening clearances in mind when fi nishing material is protrudes of the Front. (See pages 29-30) .

Set the nailing fl anges for sheet rock thickness and install the appliance.

Install the mounting frame.

Install the fi nishing material to edge of the mounting frame.

Complete the installation following all specifi ed clear- ances to combustibles.

December 6, 2011

7051-158B

Page 29

Page 29
Image 29
Quadra-Fire 7051-158B owner manual Edge 60 Pellet Fireplace Finishing Material, Flush with the Mounting Frame