Regency F39-NG, F39-LPG Dv Stove Horizontal Flue Kit, Installation, Qty. Description, Optional

Models: F39-LPG F39-NG

1 31
Download 31 pages 24.14 Kb
Page 10
Image 10
DV STOVE HORIZONTAL FLUE KIT

INSTALLATION

DV STOVE HORIZONTAL FLUE KIT

Horizontal Stove Flue Kit (Part # 946-112) includes all the parts needed to install the F39 Freestand- ing Gas unit with minimum horizontal and vertical vent dimensions. For installations that require longer vertical and/or horizontal vents use the Dura-Vent system as shown in your manual.

Qty. Description

1)2 Rigid Pipe Section 1.2m length, 165mm inside diameter

2)

 

1

Flex Liner, compressed aluminium 2 ply liner, 102mm inside diameter

3)

 

4 spring spacers

4)

 

1

90 deg. Elbow

5)

 

1

Decorative Wall Trim

 

 

 

 

6)

 

1 Adapter

 

 

7)

1

 

AstroCap Termination Cap

8)

2

 

Trim Collar

9)

1

 

tube of Mill-Pac, high temperature sealant

10)

12 Screws, #8 x 1/2" Self tapping, Stainless Steel

11)14 Screws, #8 x 1/2" Self tapping, Black

12) 4 Screws #8 x 1-1/2" Drill Point, Stainless Steel

Optional:

946-206 Vinyl Siding Standoff

for AstroCap

Note:

a)Liner sections should be continuous without any joints or seams.

b)This is an approved system, therefore components in this system must not be substituted for any other manufacturer's products.

c)Wall Thimble is required when installing through a combustible wall.

DV STOVE HORIZONTAL FLUE KIT (# 946-112) INSTALLATION

Review the following sequence of instructions which are typical of most installations. The sequence may vary depending on wall thick- ness. Refer to flue location, see "Exterior

Flue Termination Location" section. and clearance dimensions, see to "Clearances to Combustibles" section.

1)Set the unit in its desired location. Check to determine if wall studs will be in the way of the fl uing system, adjust location until all clearances are met and there are no obstructions.

Note: A 1-1/2"(38mm) clearance around the outer pipe must be maintained except that only a 1" (25mm) clear- ance is needed at the termination end.

IMPORTANT:

Do not locate termination hood where excessive snow or ice buildup may occur. Be sure to check flue termination area after snow falls, and clear to prevent accidental blockage of fluing system. When using

F39: 59-3/4" ( 1518mm)

Minimum Installation Height:

snowblowers,makesuresnowisnotdirected towards flue termination area.

2)Assemble a trial fit to determine the verti- cal center-line for the fl ue termination.

a)Cut a 241mm round hole on both the interior and exterior wall.

b)Attach the 2 ft. pipe section to the fl ue terminal and slide into position from theexterior.Thelargerdiameterend of the adjustable pipe goes to the flue terminal.

c)Install the 90o elbow onto the adjust- able pipe to determine the vertical centerline of the starter collar on the unit.

Note: if the centerline cannot be met, the adjustable sections will have to be cut.

d)Cut the 2 ft. section of rigid pipe to length. Ensure that the pipe length

10

Regency® F39 Room Sealed Freestanding Gas Stove

Page 10
Image 10