Regency F39-NG Dura-Flue Termination Kit, Dura-Fluefluing Components, Installation, 90o Elbow

Models: F39-LPG F39-NG

1 31
Download 31 pages 24.14 Kb
Page 12
Image 12
DURA-FLUE

INSTALLATION

DURA-FLUE

TERMINATION KIT

Planning Your Dura-Flue

Installation

There are two basic types of Dura-Flue Room Sealed System installations: horizontal termi-

Note: These are the minimum pieces re- quired. Other parts may be required for your particular installation. See page 12 for a list of flue parts.

If installing termination on a siding covered wall, a vinyl siding standoff or furring strips can be used in order to ensure that the termination is not recessed into siding.

and fi ttings are used for concealed locations such as attics or where corrosion is a factor, such as above the roof line. Decorative brass trim kits are available for both wall thimbles and ceiling support boxes.

Part #

Description

971Horiz. Termination Kit includes:

90o

nation and vertical termination. Confi rm the maximum horizontal run and maximum vertical rise from the diagrams, refer to "FluingArrange-

The vinyl siding standoff is required for walls

black elbow, wall thimble cover,

with vinyl siding.

horiz. square termination cap,

 

24"

ments" section.

When planning your installation, it will be nec- essary to select the proper length of fl ue pipe for your particular requirements. For horizontal installations, determine the minimum clearance from the rear of the unit to the wall. It is also important to note the wall thickness. (The wall thimble is suitable for 2 x 4 or 2 x 6 wall construc- tion.) Select the amount of vertical rise desired for "vertical-to-horizontal" type installations.

Warning: Always maintain required clear- ances (air spaces) to nearby combustibles to prevent a fire hazard. Do not fill air spaces with insulation.

The minimum clearance requirements between the outer wall of the fl ue pipe and nearby com- bustible surfaces is 1-1/4 inch. Be sure to check the fl ue termination clearance requirements from decks, windows, soffi ts, gas regulators, air supply inlets and public walkways as specifi ed in the Exterior Flue Terminal Locations on page 8 and in your local building codes.

Minimum components for a Dura-Flue HorizontalInstallation:

A)Dura-Flue Horizontal Termination Kit

B)Wall Thimble (required for combus- tible walls)

Minimum components for a Dura-Flue Verti- cal Termination:

C)Dura-Flue Vertical Termination Kit See page 12 for pipe lengths.

The Simpson Dura-Flue Room Sealed System offers a complete line of component parts for installationofbothhorizontalandverticalinstalla- tion. Many items are offered in decorative black, as well as galvanized finish.The galvanized pipe

Vertical

Terminal

Storm Collar

Part # 953

black pipe, 11" -14" 5/8" adjust-

able

black pipe

970Basic Horiz. Termination Kit includes: 90o black elbow, wall thimble cover, horiz. square

termination cap

978Vert. Termination Kit includes 0/12 - 6/12 pitch adjustable

fl ashing, storm collar, low profi le term. cap

908B 6" Pipe Length-Black

907B 9" Pipe Length-Black

90612" Pipe Length Galv.

906B 12" Pipe Length-Black

90424" Pipe Length Galv.

904B 24" Pipe Length-Black

90336" Pipe Length Galv.

903B 36" Pipe Length-Black

90248" Pipe Length Galv.

902B 48" Pipe Length-Black

911B 11"-14 5/8" Adj. Pipe Length- Black

917B

17"- 24" Adj. Pipe Length Black

945

45O Elbow Galv.

To determine the length of fl ue pipe required for vertical installations, measure the distance from the unit fl ue outlet to the ceiling, the ceiling thickness, the vertical rise in an attic or second storey, and allow for suffi cient vertical height above the roof line.

For multi-storey applications, fi re stops are required at each fl oor level. If an offset is needed, additional pipe, elbows and supports will be required.

Do not exceed the maximum number of elbows. One 90o for horizontal terminations and two 45o for vertical termination.

DURA-FLUE FLUING

COMPONENTS

You will require the following components with your new Regency® Room Sealed Freestand- ing Gas Stove. Please review your product to make sure you have everything you need. In the efl ue that you are missing any part, contact your dealer.

Flashing

 

Vinyl Siding

 

 

Standoff (Optional)

 

 

943 or 943S

 

 

 

Part #950

 

 

 

Round

 

 

 

 

 

 

Ceiling Firestop

Support Box/

 

 

 

(Part # 963)

Wall Thimble

 

 

 

 

(Part # 940)

 

 

AstroCap

 

 

 

 

Round Support

 

 

Termination Cap

 

 

(Part# 946-523)

Box/Wall Thimble

 

 

 

 

 

 

(Part # 940)

 

Wall Thimble

 

 

 

 

 

 

Part # 942

 

Pipe Length

Adj.Pipe Length

 

 

 

11" - 14-5/8"

 

Dura-Flue Basic

 

(279mm - 372mm)

 

 

90o Elbow

 

 

Horizontal Kit # 970

 

 

 

1

90o Elbow

 

 

 

1

Wall Thimble Cover

 

24" (610mm)

 

1

Astro Cap

 

Pipe Length

 

 

 

 

 

12

Regency® F39 Room Sealed Freestanding Gas Stove

Page 12
Image 12
Regency F39-NG Dura-Flue Termination Kit, Dura-Fluefluing Components, Planning Your Dura-Flue Installation, Dura-FlueBasic