Regency U39-LP1, U39-NG1 Installation, Secure with screw, green ground wire, Battery Compartment

Models: U39-LP1 U39-NG1

1 44
Download 44 pages 36.34 Kb
Page 26
Image 26
6) Secure with screw.

INSTALLATION

6) Secure with screw.

11) Attach the Piezo Ignition Wire to the

 

back of the DC Sparker box.

15)Attach the green ground wire.

7)Reversing step 2 and secure the control panel back onto the stove pedestal with the screws.

12)The ground wire and DC Sparker ignition go through the hole on the heat shield.

green ground wire

16)Install the supplied battery into the DC Sparker Box by opening the battery compartment.

NOTE: The battery in the DC Sparker Box will need to be replaced annually.

Battery

Compartment

8)Attach one end of the green ground wire to the grounding stud on the inside of the pedestal.

9)The Ground Wire, DC Sparker Ignition Wire and Piezo Spark Wire all go through the hole located on the pedestal back cover.

10)Put on the plastic split bushing.

13)Apply the plastic bushing to the heat shield hole.

14)Connect the DC Sparker Ignition Wire to the DC Sparker.

17)Place the heat shield over the DC Sparker.

18)We recommend mounting the DC Sparker box onto the pedestal back cover.

19)Check for gas leaks.

20)Check inlet and outlet pressures.

21)Check operation of fl ame control.

22)Check for proper fl ame appearance and glow on logs.

26

Regency® U39 ULTIMATE Direct Vent Freestanding Gas Stove

Page 26
Image 26
Regency U39-LP1, U39-NG1 installation manual Installation, Secure with screw, green ground wire, Battery Compartment