Installation Manual
ULTIMATE U39
Direct Vent Freestanding Gas Stove
Owners
To the New Owner
REGENCY
ULTIMATE Direct Vent Freestanding Gas Stove
TABLE OF CONTENTS
SAFETY LABEL
INSTALLATIONMAINTENANCE
PARTS LIST
SAFETY LABEL
Copy of Safety Label for U39 Gas Stove
REQUIREMENTS
MA Code - CO Detector
5.08 Modifications to NFPA-54,Chapter
OBSTRUCTIONS
INSTALLATION
SPECIFICATIONS
IMPORTANT MESSAGE SAVE THESE INSTRUCTIONS
BEFORE YOU START
INSTALLATION
INSTALLATION CHECKLIST
GENERAL SAFETY INFORMATION
U39-NG1& U39-LP1Reference Dimensions
INSTALLATION
LOUVER INSTALLATION
VENTING INTRODUCTION
MANUFACTURED MOBILE HOME ADDITIONAL REQUIREMENTS
INSTALLATION
EXTERIOR VENT TERMINAL
INSTALLATION
4” X 6-5/8”RIGID PIPE CROSS REFERENCE CHART
Offset Pipe Selection
INSTALLATION
4” x 6-5/8”Rigid Pipe Cross Reference Chart Cont
INSTALLATION
When using Rigid Vent other than
RIGID PIPE VENTING SYSTEMS
Horizontal or Vertical Terminations
INSTALLATION
INSTALLATION PRECAUTIONS
SAFETY PRECAUTIONS FOR THE INSTALLER
Mobile Homes Installations
INSTALLATION
Horizontal Venting with Two 2 90o Elbows
Vertical Venting with Two 2 90o Elbows
Option
INSTALLATION
DV STOVE HORIZONTAL VENT KIT INSTALLATION
DV STOVE HORIZONTAL VENT KIT # 946-116& #946-216
Qty. Description
capcanbemounted on
INSTALLATION
Note The pipe seam should be facing down
INSTALLATION
Planning Your Dura-Vent Installation
DURA-VENT TERMINATION KIT
DURA-VENTVENTING COMPONENTS
INSTALLATION
Diagram
Diagram
Diagram
INSTALLATION
Below Grade Installation
Diagram
Diagram
INSTALLATION
Offset Chart
CATHEDRAL CEILINGS
Round Support RDS & Square Support SQS
INSTALLATION
Approved for US Installations Only
Diagram
Diagram
INSTALLATION
Diagram Diagram
Diagram
Diagram
INSTALLATION
Diagram
Diagram Diagram
GAS CONNECTION
INSTALLATION
Installation of LPG Conversion Kit
Pilot assembly is now accessible for steps 4 to
CONVERSION KIT# 731-969FROM NG TO LP
Burner Orifi ce
INSTALLATION
ONLY REQUIRED FOR THE U38
INSTALLATION
green ground wire
Battery Compartment
6 Secure with screw
INSTALLATION
GAS PIPE PRESSURE TESTING
CONVERSION TO LOWER BTU RATING
THIS CONVERSION MUST BE DONE BY A QUALIFIED GAS
INSTALLATION
AERATION ADJUSTMENT
Valve Description
U39 with 38,000 Btu/h
INSTALLATION
LOG SET INSTALLATION
Pins on Rear Log Support
The 02 refer numbers i.e. 02-65are
INSTALLATION
B02-56 E02-45
Lava Rock
C02-44
INSTALLATION
F02-47 A02-65 E02-45
G02-48 E02-45 Side View
Bracket
INSTALLATION
WIRING DIAGRAM
INSTALLATION
wall thermostat wires to the 120V wires
Thermostat Wire Table
remote control wires to the 120V wires
OPERATING INSTRUCTIONS
LIGHTING PROCEDURE
OPERATING INSTRUCTIONS
SHUTDOWN INSTRUCTIONS
Adjusting Flame Height
OPERATING INSTRUCTIONS
NORMAL OPERATING SOUNDS OF GAS APPLIANCES
AUTOMATIC CONVECTION FAN OPERATION
MAINTENANCE
MAINTENANCE INSTRUCTIONS
GENERAL VENT MAINTENANCE
GOLD-PLATEDDOORS
MAINTENANCE
LOG REPLACEMENT
LATCH ADJUSTMENT
GLASS REPLACEMENT
MAINTENANCE
FAN MAINTENANCE
DC SPARKER BATTERY REPLACEMENT
Disconnect power supply before servicing
Note Use a magnetic type screwdriver if possible
MAINTENANCE
REMOVING VALVE
Description
PARTS LIST
MAIN ASSEMBLY
Description
PARTS LIST
BURNER & LOG ASSEMBLY
Description
PARTS LIST
DOOR ASSEMBLIES
Exclusions
WARRANTY
Conditions
See the inside back cover for details