Tractor | |
Boom Unit | |
Cutting Component Inspection | |
Cutting Component | |
Blade Bolt Inspection | |
DRIVING THE TRACTOR AND IMPLEMENT | |
Starting the Tractor | |
Brake and Differential Lock Setting | |
Driveline Angle Problems | |
Driving the Tractor and Boom | |
OPERATING THE BOOM UNIT AND ATTACHED HEAD | |
Operating Instructions | |
Operating the Control Valve | |
Foreign Debris Hazards/Overhead Obstructions | |
Operating Speed and Ground Speed | |
Shutting Down the Implement | |
DISCONNECTING THE MOWER FROM THE TRACTOR | |
TRANSPORTING THE TRACTOR AND IMPLEMENT | |
Transporting on Public Roadways | |
Hauling the Tractor and Implement | |
TROUBLESHOOTING GUIDE |
MAINTENANCE SECTION | |
HAZARDS WITH MAINTENANCE OF IMPLEMENT | |
PARTS INFORMATION | |
LUBRICATION INFORMATION | |
HYDRAULIC FLUID | |
Proper Oil Level | |
DRIVELINE LUBRICATION | |
MAIN DRIVELINE & CAT 4 SAFETY SHIELD | |
BLADES | |
BLADE SERVICING | |
BLADE SHARPENING | |
BLADE REMOVAL | |
BLADE CARRIER REMOVAL | |
BLADE CARRIER INSTALLATION | |
Hardware | |
Cylinder Rod Maintenance | |
Boom Cylinder Removal and Replacement Instructions | |
Hydraulic Component Maintenance Schedule | |
LEXAN Sheet Cleaning Recommendations | |
Cleaning Procedure for Small Areas - Manual | |
Cleaning Procedure for Large Areas - Automated | |
Other Important Instructions for All Lexan Sheets: | |
Additional Important Considerations for Multiwall, Corrugated and Sign Sheet | |
Graffiti removal from Lexan* Margard* sheet | |
STORAGE | |
PROPER TORQUE FOR FASTENERS | |
SERVICE OF SPINDLE HOUSING | |
Removing Bearing | |
Inspection | |
Assembly | |
MOTOR & COUPLING INSTALLATION | |
TAPER BUSHING & SHEAVE INSTALLATION | |
START UP PROCEDURE |