Checking OFF To Do List Items

When items are completed, they can be checked off to indicate the item has been completed.

Checking off a Completed Item

1.Tap the check box located on the left side of the “To Do List” item.

Note: The To Do List can be set to display or hide items that have already been checked off. By default, completed items will not be displayed but are always stored until you delete them.

Changing Priorities and Due Dates

You can change the To Do List to display the due date assigned to an item, change its priority, and assign a category to the task with the To Do Item Details dialog box.

You can then sort To Do List items by priority, due date, or category.

Changing the Priority, Due Date and Category

1.In the To Do List, tap the desired item.

2.Tap the Details button.

3.In the Details dialog box, tap the Category drop down menu. Select the desired category, or create a new one.

4.In the Details dialog box, tap the Due Date drop down menu. Choose one of the following options:

Today - Automatically inserts the date in the “Due Date” field.

133

Page 137
Image 137
Samsung SPH-I330 manual Checking OFF To Do List Items, Changing Priorities and Due Dates, Checking off a Completed Item