Sanyo PLC-WL2503A owner manual Setting, Standby mode, Note, Power management

Models: PLC-WL2503A

1 78
Download 78 pages 35.77 Kb
Page 51
Image 51
Standby mode

Setting

Standby mode

 

This function is available when operating the projector via

 

network.

 

Network..... Supply the power to the network function even

 

after turning off the projector. You can turn on/

 

off the projector via network, modify network

 

environment, and receive an e-mail about

 

projector status while the projector is powered

 

off.

 

Eco............. Select Eco when you do not use the projector

 

via network. The projector’s network function

Power management

will stop when turning off the projector.

 

Refer to the owner’s manual of “Network Set-up and

 

Operation”.

 

Note:

Timer left before Lamp is off.

• Factory default is Network.

 

• When Eco is selected and the projector is in Stand-by,

 

the communication of RS-232C serial port is not

 

available.

 

Power management

For reducing power consumption as well as maintaining the lamp life, the Power management function turns off the projection lamp when the projector is not operated for a certain period.

Select one of the following options:

Ready

When the lamp has been fully cooled

 

down, the POWER indicator changes

 

to green blinking. In this condition, the

 

projection lamp will be turned on if the

 

input signal is reconnected or any button

Shut down

on the remote control is pressed.

When the lamp has been fully cooled

Off

down, the power will be turned off.

Power management function is off.

Timer

If the input signal is interrupted and

 

no button is pressed for more than

 

30 seconds, the timer display with No

 

signal appears. It starts the countdown

 

until the lamp is turned off. Use the Point

 

▲▼ buttons to set the Timer (1~30Min).

Note:

Factory default is Ready: 5 Min.

51

Page 51
Image 51
Sanyo PLC-WL2503A owner manual Setting, Standby mode, Note, Power management