EVS Toolroom Lathe w/DRO

S E R V I C E

For Machines Mfg. Since 3/11

11.Return the retaining ring against the shroud washer and position the retaining ring ears over the shear pin head, as shown in Figure 137. This will prevent the shear pin from falling out if the shroud washer should rotate during operation.

Figure 137. Retaining ring positioned with ears in

front of pin access groove.

Tools Needed:

Qty

Hex Wrenches 6mm

.............................................. 1

Hex Wrench 8mm

1

Wrench 17mm

1

Dead Blow Hammer

.............................................. 1

Gap Removal

1.Remove the four gap-bed cap screws, shown in Figure 139.

Dowel Pin

Jack Nut

Gap-Bed

Cap Screw

Way End

Cap Screw

Figure 139. Fasteners holding gap in place.

Gap Insert Removal & Installation

The gap insert directly under the spindle (see Figure 138) can be removed to create additional space for turning large diameter parts.

The gap insert was installed, then ground flush with the bed at the factory to ensure a precision fit and alignment. Therefore, if the gap insert is removed, it may be difficult to re-install with the same degree of accuracy.

Gap Insert

Figure 138. Gap insert.

2.Remove the two way-end cap screws.

3.Tighten the two dowel-pin jack nuts until the pins are pulled free from the gap insert.

4.Tap the outside of the gap insert with a dead blow hammer to loosen it, then remove it.

-86-

Page 88
Image 88
Southbend SB1059F owner manual Gap Insert Removal & Installation, Gap Removal