Southbend SEZ-5, SEZ-3 manual Operation, Startup, Notice Water Specification, Shutdown

Models: SEZ-3 SEZ-5

1 48
Download 48 pages 41.95 Kb
Page 12
Image 12
OPERATION

OPERATION

OPERATION

SEZ SERIES COUNTERTOP STEAMERS

OPERATION

STARTUP

1.Turn lever to “ON” position.

2.Unit will fill automatically and be ready for operation in 15 minutes.

NOTICE: WATER SPECIFICATION

To meet warranty requirements, supply water must meet the following specification:

Total Dissolved Solids (TDS)

60 PPM

Hardness

2 Grains or 35 PPM

pH Factor

7.0 to 7.5

OPERATION

!CAUTION

HOT STEAM WILL ESCAPE WHEN DOOR IS BEING OPENED. TO PREVENT BURNS KEEP HANDS AND FACE AWAY FROM STEAM.

If “SERVICE REQUEST” light illuminates during operation, contact your authorized service agency immediately.

1.Suggested cooking times for various foods are shown in the table in the following section.

2.Pan specifications are shown on specifications page (page 4).

3.The door may be opened or closed at any time.

4.Timer can be used as desired, but it has no effect on the operation of the unit!

5.Unit will automatically idle at operating temperature when and if the door is closed and there is no food in the cavity.

SHUTDOWN

1.Turn lever to the “OFF” position.

2.Remove pan guides.

3.Clean all interior surfaces with soap, water, and a non-metallic pad. Occasional use of a deliming solution such as Lime-A-Way is recommended. RINSE THOROUGHLY WITH CLEAN WATER.

4.Ensure drain opening is clear.

5.Replace pan guides.

6.Leave the door open at night after cleaning to prolong the life of the gasket.

NOTICE

DO NOT USE high-chlorine or bleach solution for cleaning the door gasket.

DO NOT USE steel wool or other metallic pads in the steamer.

PAGE 12

OPERATORS MANUAL 1181587

Page 12
Image 12
Southbend SEZ-5, SEZ-3 manual Operation, Startup, Notice Water Specification, Shutdown