How to Change Injector (Orifice) Size
1.Disconnect electrical power from tumbler. Close gas
2.Remove gas valve.
Johnson G96 Gas Valve – Unscrew spud holder nut near gas valve. Refer to Figure 7. Remove the burner orifice(s) from spud holder. Refer to
3.Install the new, correct injector(s) (orifices). Refer to Figure 8. Torque each to
4.Reinstall spud holder assembly to gas valve, making certain orifice(s) are in line with burner tube opening. Refer to Figure 6.
5.Commission tumbler for use.
NOTE: Blank injectors (orifices) are Part No. M400995.