Sterling SGFE operating instructions Starting the conveying procedure, First conveying operations

Models: SGFE

1 50
Download 50 pages 57.73 Kb
Page 22
Image 22

Starting the conveying procedure

3.5. Starting the conveying procedure

Set the on/off switch in position ”ON”.

&

If the hopper loader reports a lack of material, the conveying is started.

3.6. The first conveying operations

F

Check the rotational direction of the vacuum generators.

Check the line system.

Adjusting the suction tube.

Material coming from the hopper loader during the first con- veying may not be used.

SM4-618

Start-up 3-7

Page 22
Image 22
Sterling SGFE operating instructions Starting the conveying procedure, First conveying operations