Sterling sse manual Connecting Material Lines, Setting the ratio, Set the cycle switching

Models: sse

1 77
Download 77 pages 53.08 Kb
Page 29
Image 29
Connecting Material Lines:

Machine-Side Hopper Loaders

Connecting Material Lines:

Component 1 – connected to the intake port furthest from the air cylinder (regrind)

Component 2 – connected to the intake port closest to the air cylinder (virgin)

Setting the ratio:

When the loader motor is not running, pressing the arrow key on the valve’s controller will change the percentage of component 1. This can be set from 0% to 99%

Set the cycle switching:

Press and hold the percentage key on the valve’s controller. Then by pressing the up arrow, you will be selecting the cycle time period in increments of 5 sec.

For example, if the convey time is 60 seconds and you select a cycle time period of 10 sec. the valve will switch a total of 6 times.

4-10 Assembly instructions

Page 29
Image 29
Sterling manual Connecting Material Lines, Setting the ratio, Set the cycle switching, 4-10Assembly instructions