Image 36
6.5. Initial operation

Machine-Side Hopper Loaders

6.5. Initial operation

Metal shavings may be inside the pipe from cutting down pipes into lengths. These are pulled during the first conveying process and collected in the separator.

FThis material should not be used again.

6.6. Switching off the unit

Locate the power switch on the left side of the control box and switch it to the “off” position.

Operation 6-5