Step 4. FIELD WIRING

Step 4. FIELD WIRING

The gas valve is set in place and pre-wired at the factory on both models.

A. SIT and Honeywell Millivolt Wiring

(See Figure 44 )

1. Select any of the following optional con- trols: appliance-mounted (rocker switch) or wall-mounted switch, thermostat, or one of the optional remote control kits. If appliance- mounted ON/OFF control is selected mount it in the gas valve mounting bracket.

2. If wall-mounted ON/OFF control or thermo- stat is selected mount it in a convenient location on a wall near the fireplace.

3. Wire the control switch within the millivolt control circuit using the 15 feet of 2 conductor wire supplied with the unit. Caution: do not connect the optional wall switch to a 120V power supply.

4.Alternatively, the appliance may be operated without the use of the controls indicated in step 1, solely by manipulating the gas valve control knob. In order to use this method, twist the free ends of the two conductor wire (located inside the bottom compartment of the unit) together as shown in Figure 44.

Note: The supplied 15 feet of 2 conductor wire has one end of each conductor connected to the gas valve circuit and the other end of each conductor placed loose inside the bottom com- partment of the unit.

Millivolt Wiring Diagram

If any of the original wire as supplied must be replaced, it must be replaced with Type AWM105° C – 18 GA. wire.

Note: The supplied 15 feet of 2 conductor wire has one end of each conductor connected to the gas valve circuit and the other end of each conductor placed loose inside the bottom compartment.

B. Electronic Wiring (See Figure 45 ) –

Note: The electronic appliance must be con- nected to the main power supply.

1. Route a 3-wire 120Vac 60Hz 1ph power supply to the appliance junction box.

2. Remove the outlet box from the junction box by removing two screws .

3. Connect the black power supply wire to the lower outlet's red pigtail lead and the white power supply wire to the common terminal of the outlet as shown in Figure 46.

4. Connect the ground supply wire to the outlet's green ground screw.

5. Locate and install a low voltage (24V) wall switch or thermostat (not supplied) in the desired location.

6. Connect the low voltage wire to this switch or thermostat.

7.Insert the control circuit plug into the lower outlet box.

8. After wiring is complete, replace the outlet box.

Note: The gas valve-mounted ON/OFF switch is shown in Figure 45. It is integral with the gas valve.

Step 5. WIRING - OPTIONAL FORCED AIR BLOWER KIT (See Figure 45 )

4. Connect the ground supply wire to the outlet's green ground screw.

5.Reinstall the outlet box.

6. Insert the blower plug into the top outlet.

(The bottom outlet is unused on millivolt units, while the burner control circuit plugs into the bottom outlet on electronic units.)

IMPORTANT: Ground lead must be con- nected to the green screw located on the outlet box. See Figure 45. Failure to do so will result in a potential safety hazard. The appliance must be electrically grounded in accordance with local codes or, in the absence of local codes, the National Electrical Code, ANSI/NFPA 70- (latest edition). (In Canada, the current CSA C22-1 Canadian Electrical Code.)

Electronic Wiring Diagram (Honeywell)

Showing the Blower Wiring for the Optional

FBK-100 and FBK-200 Kits

1.If any of the original wire as supplied must be replaced,

1.it must be replaced with Type AWM 105° C – 18 GA. wire.

2.120V, 60Hz – Less than 3 amps.

**ON/OFF Switch (Integral

**Leave the ON/OFF switch, which is integral

with the gas valve, in the ON position.

with Gas Valve)

 

 

 

 

*OPTIONAL

 

 

Gas Valve

 

ACCESSORY

 

 

 

PILOT

SWITCH

 

 

IGNITER

ASSEMBLY

 

BK

 

BK

 

W

120

 

 

 

 

VAC.

 

R

 

G

 

 

 

 

 

 

BL

 

 

Outlet Box

 

 

 

 

 

OPT

 

Green Ground

 

G

Black

Screw

 

BLOWER

pigtail

 

 

Break Off

 

 

 

 

Tab

 

Red

 

 

 

 

pigtail

 

 

 

 

White Wire

 

 

 

to Opposite

 

 

W

Junction Box

Side

 

 

 

 

 

Transf.

 

 

 

B

 

 

 

G

120 V.

 

 

 

 

 

 

Hot side of Outlet

 

 

 

 

BL

 

24 V

 

 

 

 

 

TP

Thermopile

A A. SIT and Honeywell Millivolt Wiring B

*OPTIONAL ON/OFF SWITCH, WALL SWITCH, THERMOSTAT OR REMOTE CONTROL RECEIVER

TH TH TP

An electrical outlet box is provided for the instal- lation of the FBK-100, FBK-200 forced air blower kits (optional). Electrical power must be pro- vided to this box to operate these blowers.

1. Route a 3-wire, 120Vac 60Hz 1ph power line with control switch to the lower right rear corner of the appliance.

2. Remove the outlet box by removing two screws.

3. Connect the supply wires to the blower

 

R

W

BK

 

OPTIONAL APPLIANCE-MOUNTED ON/OFF SWITCH

OR OPTIONAL WALL SWITCH

OR OPTIONAL THERMOSTAT

OR OPTIONAL REMOTE RECEIVER

*Blower speed control switch is provided in FBK200 blower kit.

Factory Wired

Field Wired

Schematic Representation Only

Figure 45

20

*TWIST WIRES “A” AND “B” TOGETHER TO OPERATE UNIT SOLELY BY MANIPULATING THE GAS VALVE CONTROL KNOB; OR CONNECT WIRES TO OPTIONAL ON/OFF SWITCH OR WALL SWITCH OR THERMOSTAT TO OPERATE UNIT.

Figure 44

control switch. Then connect the wires from the blower control switch to the outlet box' pigtail leads as shown in Figure 45.

NOTE: DIAGRAMS & ILLUSTRATIONS NOT TO SCALE.

Page 20
Image 20
Superior DT-400CMN, DR-400CMP Field Wiring, A. SIT and Honeywell Millivolt Wiring, B. Electronic Wiring See Figure