Teledyne M201E manual 1.Preventative Maintenance Schedule

Models: M201E

1 51
Download 51 pages 51.91 Kb
Page 37
Image 37

4.0 MAINTENANCE SCHEDULE

The maintenance requirements of the M201E are the same as a standard M200E NOx analyzer but with additional maintenance items (Table 4-1). Please refer to Section 13 in the M200E Operator Manual for the M200E maintenance schedule and for maintenance and repair procedures.

The M201E requires the following additional maintenance items.

Table 4-1. Preventative Maintenance Schedule

Item

Maintenance Interval

Reference Section

NO2 molybdenum converter

 

Section 8.2.3 M200E Manual

 

 

 

Test Every Three Months

 

M501 NH3 Converter

 

Section 4.1of this manual.

 

 

Reaction Cell

Clean annually or as necessary

Section 9.3.9 M200E Manual

AutoZero flow check

Quarterly as needed

Section 4.4 of this manual.

4.1M501 NH3 MAINTENANCE

The M501 NH3 external converter is operated at 825 ºCelsius. Because of this the stainless steel ¼” tube internal to the converter slowly oxidizes and may require replacement. Over time the converter’s efficiency will degrade, due to aging of the internal catalyst. This is characterized by a CONV value on the TNx channel of < 0.8 or > 1.2, despite the converter being at temperature. The efficiency of the converter should be checked quarterly. The converter should be cleaned out on a yearly basis by removing the outer tube and shaking the fine dust particles from both the outer and inner tubes. This is also a good time to replace the catalyst screen, if necessary.

The following procedure describes how to disassemble and replace converter parts. The various parts in the converter become delicate and brittle after prolonged exposure to high temperatures. It is therefore a good idea to have a complete set of replacement parts on hand before starting, as listed in Table 4-2.

05206H DCN5910

35

Page 37
Image 37
Teledyne M201E manual 1.Preventative Maintenance Schedule