Manuals
/
Thermo Products
/
Household Appliance
/
Burner
Thermo Products
CMA1-50N, CMA2-75N
service manual
Models:
CMA1-50N
CMA2-75N
1
53
55
55
Download
55 pages
9.18 Kb
48
49
50
51
52
53
54
55
Troubleshooting
Install
Appendix – B Wiring Diagram
Figure L.ELECTRICAL WIRING
Dimension
Maintenance
Inducer Blower Assembly
F.Furnace Checkout Procedure
C.Adjustment Of Btu Input Rate
E.Setting Temperature Rise
Page 53
Image 53
All installations and services must be performed by qualified service personnel.
51
Page 52
Page 54
Page 53
Image 53
Page 52
Page 54
Contents
FOR YOUR SAFETY
INSTALLATION AND SERVICE MANUAL
GAS FIRED HIGH EFFICIENCY FURNACE
DOWN FLOW & DIRECT VENT SEALED COMBUSTION
SECTION
TABLE OF CONTENTS
I. SAFETY INFORMATION
Page
Page
The vent and air intake elbows must be kept away from bushes, shrubs or any vegetation that may restrict the flow of flue products. It must also be kept clear of any leaves, weeds or other combustible materials. Keep the vent hood clear of snow. Avoid locating the terminals in areas where standing water or condensate drippage may be a problem
1.A windows be opened
DIMENSIONS
II. FURNACE SPECIFICATIONS - CMA SERIES
MODEL
GAS SUPPLY PRESSURE
INSTALLATION PARTS PACKAGE
NON-COMBUSTIBLEMATERIAL
COMBUSTIBLE MATERIAL.” COMBUSTIBLE MATERIAL
Table
IV. GENERAL INSTALLATION A.FURNACE LOCATION
MODELS CMA
Figure 1B
Combustible Floor Base Model: 70-BASE Figure 1A
Coil Cabinet
Cottage Base Model: 01COT-BASE Figure 1C
Figure Figure
B. BASE INSTALLATION
1. Combustible Floor Base Model: 70 BASE
Figure
C. ALCOVE INSTALLATION
2. Cottage Base Model: 01COT BASE
Figure
D. CLOSET INSTALLATION
E. FUEL PIPING
F.GENERAL VENTING REQUIREMENTS
Table
MAXIMUM VENT LENGTH
Figure 6. CMA*-75SHOWN
1. Vent And Combustion Air Pipes
H. Direct Venting Through a Sidewall
2. Exhaust Vent Termination Elbow
Sidewall Venting
Page
4. Vent Terminal Location Guidelines
Terminations
Figure Figure
5.Secure plate to roof
Figure K.CONDENSATE DRAIN LINE AND TRAP ASSEMBLY
2.Connection Of Power Supply Wires
Figure L.ELECTRICAL WIRING
3.Connection Of Room Thermostat Wires
1. Electrical Branch Supply Circuit
Electrical Wire Diameter AWG 24 22 20 18
4. BLOWER MOTOR SPEED WIRING Figure
Speed Tap \
CMA1-50
Static
Pressure
Speed Tap \
CMA2-75
Static
Pressure
5. FIELD WIRING AND REPLACING WIRING
V.STARTING THE UNIT A. SEQUENCE OF OPERATIONS
MAIN BURNER OPERATION CALL FOR HEAT SATISFIED
OPERATING INSTRUCTIONS
B.INITIAL START UP
C.ADJUSTMENT OF BTU INPUT RATE
D.BURNER ADJUSTMENT
GAS PRESSURE CHART FOR CMA* MODEL FURNACES
Figure
E.SETTING TEMPERATURE RISE
F.FURNACE CHECKOUT PROCEDURE
VII. DEALER MAINTENANCE
VI. INSTALLERS INSTRUCTIONS TO USER
4. INDUCER BLOWER ASSEMBLY
2.CONDENSATE LINE/TRAP ASSEMBLY
A.ELECTRICAL
B.GENERAL INSPECTION
5. GASKETS/SEALING MATERIALS
1.CLEANING THE COIL AIR SIDE
C.HEAT EXCHANGER
D.HOUSE AIR BLOWER
FILTER REPLACEMENT
FILTER MAINTENANCE PROCEDURE
VIII. TROUBLESHOOTING
DIAGNOSTIC FEATURES
The LED will also flash once at power-up
TROUBLESHOOTING GUIDE
AT THE INTEGRATED CONTROL?
Yes AFTER GAS VALVE OPENS, DO THE BURNERS IGNITE?
DOES SYSTEM RUN UNTIL THERMOSTAT IS SATISFIED?
IF LED LIGHT FLASHES
APPENDIX – A REPLACEMENT PARTS
Page
APPENDIX – B WIRING DIAGRAM
Top
Page
Image
Contents