5.Once the installation is complete, use a 3/4 inch wrench to screw down the UPS leveling feet located next to the four casters, until the unit is no longer resting on the casters.
6.The UPS generates and can radiate
7.It is the responsibility of the installer of this equipment to provide a suitable disconnect for the Control Panel supplying power to this equipment.
This disconnect must:
Be suitable for the Voltage and Full Load Ampere Rating of all downstream equipment supplied by the Panel;
The supply disconnecting device shall be one of the following types:
•
•As above, except one that has an auxiliary contact that in all cases causes switching devices to break the load circuit before the opening of the main contacts of the disconnector.
•A circuit breaker suitable as an isolation device per IEC
•Any other switching device in accordance with an IEC product standard that also meets the isolation requirements of IEC
Be approved for use as a disconnect for the country in which this equipment is installed. Be provided with a Lock Out Tag Out capability in the Off (Down) position.
8.Allow 5 minutes after power is removed for internal capacitors to fully discharge before attempting to service the unit.
9.The user should provide output
10.After ensuring that all power sources are turned off and isolated in accordance with established lockout/tagout procedures, connect the power source wiring of the correct voltage to the input terminals of the UPS.
11.The end user must supply suitable strain relief for the power cord and the cord must extend a distance of 1/2 diameter beyond the clamp.
12.Connect the output terminals of the UPS to the load in line with local wiring regulations. Size the branch circuit conductors in accordance with NEC Table 310.16.