Concealed Duct High Static Pressure | Installation Manual |
|
!Heat insulating process
•After drain check, covering the heat insulator for drain connecting section, wrap the drain pipe with heat insulator (Locally procured) without clearance from the end of the drain pipe connecting port of the indoor unit.
Drain pipe connecting port | Heat insulation (Locally procured) | ||||||||
|
|
|
|
|
| Thickness 10mm or more | |||
Indoor unit |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| – 21 – |