TL-SL3226P24+2G Gigabit Managed Switch User's Guide

Chapter 3 Installation

3.1 Installation

Follow these steps to install the switch:

!The surface must support at least 5kg

!The power source must be within 1.5m

!Check the power cable to make sure the connection to AC power

!Leave enough space for the ventilation

3.1.1 Desktop or Shelf Installation

1.Put the TL-SL3226P on the big and stable desktop, bottom up.

2.Attach the cushioning feet on the bottom at each corner of the device.

3.Upturn the device, put it on the desktop.

3.1.2 Rack Installation

The TL-SL3226P can be mounted in an EIA standard size 19 inch rack.

1.Attach a mounting bracket to each side of the TL-SL3226P with the screws provided.

2.Sl ide the TL-SF3226P into the Rack.

3.U se the screws to secure the TL-SL3226P to the Rack.

TL-SL3226P

24+2G Gigabit Managed Switch User's Guide

Slot

1

 

 

 

 

 

 

 

 

 

 

 

 

1000M

 

Slot

2

1

3

 

 

 

 

 

 

 

 

 

Act

 

 

Link

 

5

7

 

 

 

 

 

 

 

 

TX

RX

Act

 

 

9

11

13

15

 

 

 

10/100M

FDX/Col

Link/Act

 

 

 

 

 

 

 

17

19

21

23

 

 

 

 

 

 

 

 

 

 

 

 

 

100M

2

4

 

 

 

 

 

 

 

 

 

 

 

TL-SL3226P

 

6

8

10

 

 

 

 

 

 

 

 

 

 

 

 

12

14

 

 

 

 

 

Power

 

 

 

 

 

 

16

18

 

 

 

Console

 

 

 

 

 

 

 

20

22

 

 

 

 

 

 

 

 

 

 

 

 

 

24

24+2G

Gigabit Managed Switch

 

 

 

 

 

 

 

 

 

 

 

 

 

Figure 3-1 Rack Installation

3.1.3 Power On

The TL-SL3226P can be used with the power source in the range of 110 to 260VAC, 50 to 60Hz.

The internal power system of the TL-SL3226P can automatically adjust the operating power-pressure according to the power-pressure input. The POWER LED will be light when power on.

Caution:

As a precaution in the event of a power failure, unplug the switch. When the power resumed, plug the switch back in.

Page 6
Image 6
TP-Link TL-SL3226P manual Desktop or Shelf Installation, Rack Installation, Power On