Requirements for Steam Heat (SSH_)

[ ] Install an automatic air vent at the top of the return water coil header.

[ ] Route properly sized steam piping through the base of the unit into the heating section.

[ ] Install the factory-supplied, 2-way modulating valve

[ ] Complete the valve actuator wiring.

[ ] Install 1/2", 15-degree swing-check vacuum breaker(s) at the top of each coil section. Vent breaker(s) to theatmo- sphere or merge with return main at discharge side of steam trap.

[ ] Position the steam trap discharge at least 12" below the outlet connection on the coil.

Installation (Continued)

[ ] Use float and thermostatic traps in the system, as re- quired by the application.

O/A Pressure Sensor and Tubing Installation

(All units with Statitrac)

[ ] O/A pressure sensor mounted to the roof bracket.

[ ] Factory supplied pneumatic tubing installed between the O/A pressure sensor and the connector on the vertical support.

[ ] Field supplied pneumatic tubing connected to the proper fitting on the space pressure transducer located in the filter section, and the other end routed to a suitable sens- ing location within the controlled space.