Trane SCXG-SVX01B-EN manual pre-startup, Installation requirements, mizer left-handpiping

Models: SCXG-SVX01B-EN

1 116
Download 116 pages 5.51 Kb
Page 40
Image 40
Figure I-PR-8. Detail view of ship-separate

pre-startup

Installation requirements

Waterside Economizer with left-hand factory piping components

Figure I-PR-8. Detail view of ship-separate

tubing assemblies for waterside econo-

mizer left-hand piping

Figure I-PR-9.Waterside economizer with left-hand factory piping tubing assembly

Item Part Description Waterside Economizer Ship-Separate Parts List

A

Assembly #1

 

 

Factory

Item Part #

Qty.

Description

B

Assembly #2

 

 

Piping

 

 

 

C

Assembly #3

 

 

Left-Hand

4001

2

Tube; 2 5/8” x 9”

D

Assembly #4

 

 

 

X17110026250

5

Elbow; 2 5/8” x 2 5/8

 

 

 

 

 

4003

1

Tube; 2 5/8” x 26 1/8

E

Tube; 2 5/ ” x 16

7/ ”

 

 

 

8

8

 

 

4740

1

Tube; 2 5/8” x 33 1/2

F

Tube; 2 5/8” x 22 5/8

 

 

 

 

4009

1

*Tube; 2 5/8” x 14 7/8

 

 

 

 

 

 

 

 

 

 

X21040098390

10 ft.

*Gasket

 

 

 

 

 

X21080406110

1

*Insulation; 2 5/8” Rubatex

 

 

 

 

 

X16120203570

1

Plug; 1 1/2” Brass

 

 

 

 

 

X17150027060

1

Bushing; 2 1/2” ftg. x 1 1/2

 

 

 

 

 

X17170031210

1

Tee; 2 5/8” x 2 1/8” x 2 5/8

 

 

 

 

 

4738

1

*Tube; 2 5/8” x 19 3/4

 

 

 

 

 

4007

1

Tube; 2 5/8” x 14 1/2

 

 

 

 

 

X45000032020

1 roll

Tape, 1.5’ wide

 

 

 

 

 

4006

1

Tube; 2 5/8” x 19 15/16

40

SCXG-SVX01B-EN

Page 40
Image 40
Trane SCXG-SVX01B-EN pre-startup, Installation requirements, tubing assemblies for waterside econo, mizer left-handpiping