GAS PIPING
The upflow/ horizontal furnace is shipped standard for left side installation of gas piping. A
The installation of piping shall be in accordance with piping codes and the regulations of the local gas com- pany. Pipe joint compound must be resistant to the chemical reaction with liquefied petroleum gases.
Refer to piping Table 13, for delivery sizes. Connect gas supply to the unit, using a ground joint union and a manual
National codes require a condensation drip leg to be in- stalled ahead of the controls as shown in Figures
Installer’s Guide
The furnace must be isolated from the gas supply piping by closing its individual manual
NOTE:
Maximum pressure to the gas valve for natural gas is 13.8" W.C. Minimum pressure is 5.0" W.C. Maximum pressure to the gas valve for propane is 13.8" W.C. Minimum pressure is 11.0" W.C.
All gas fittings must be checked for leaks using a soapy solution before lighting the furnace. DO NOT CHECK WITH AN OPEN FLAME!
▲! CAUTION
Use a backup wrench on the gas valve when installing gas piping to prevent damage to the gas valve and manifold assembly.
E
AUTOMATIC GAS VALVE WITH MANUAL SHUTOFF
AUTOMATIC GAS VALVE
WITH MANUAL SHUTOFF
MAIN MANUAL
SHUTOFF VALVE
MAIN MANUAL
SHUTOFF VALVE
GROUND
UNION
JOINT
DRIP
LEG
GROUND
UNION
JOINT
DRIP
LEG
UPFLOW – LEFT HAND GAS PIPING
UPFLOW – RIGHT HAND GAS PIPING
R
THE DOWNFLOW (VERTICAL) MAY BE INSTALLED LEFT OR RIGHT SIDE GAS PIPING
31 |