Installer’s Guide
HORIZONTAL INSTALLATION
(Upflow/ Horizontal or Downflow/ Horizontal)
NOTE:
In horizontal venting when the factory supplied “off- set” (2X3 reducing coupling) is used for 3” vent pipe installation, make sure the marking “Top” is located on the top side of the pipe. The straight side must be on bottom for proper condensate drainage. This coupling is factory supplied only with the following models: *UC120 & *DC120, *UX120 & *UY120 *UX100 & *UY100, *UX808C960, and all *DX & *DY models.
WHEN THE FACTORY SUPPLIED
LABEL SAYS "TOP"
STRAIGHT SIDE MUST BE
ON BOTTOM FOR PROPER
CONDENSATE DRAINAGE.
VERTICAL APPLICATIONS
Upflow furnace - The connection tubing for left and right side drainage is shipped in the blower compart- ment. Install the connection tubing from the trap to the side of the unit and trim all excess tubing to avoid kinks.
%
Right side
UPFLOW (VERTICAL)
$
2" TO 3" COUPLING
FACTORY SUPPLIED ONLY WITH THE FOLLOWING MODELS: UC120 & DC120
UX120 & UY120
UX100 & UY100 UX080C960
ALL DX & DY MODLES
^
Use Inducer Drain
hose without
extension
FURNACE
VENT
OUTLET
CONDENSATE DRAIN INSTRUCTIONS
▲! CAUTION
IT IS RECOMMENDED THAT A DRAIN PAN BE INSTALLED UNDER THE FURNACE TO PREVENT PROPERTY DAMAGE, PERSONAL INJURY OR DEATH FROM LEAKING CONDEN- SATE.
UPFLOW HORIZONTAL 17" UNITS
(Left side only)
Downflow furnace - The furnace is shipped with the left side drainage setup. To change the right side drain, remove the drain lines from the trap, rotate the trap 180° so it exits to the right, reconnect the lines, and run a 1/2" CPVC pipe from the trap out through the right side
26 |