|
| |
6 | Bottom Section | |
| ||
|
| |
Tools Needed: | Before installing the bottom section, | |
Level | the weather seal (may not be included) | |
must be installed (see Preparing the | ||
| ||
| Opening on page 10) | |
| Center the bottom section in the door | |
| opening. Level section using wooden | |
| shims (if necessary) under the bottom | |
| astragal. | |
|
|
door opening
weather seal
Level
BOTTOM
SECTION
wooden shims (if necessary)
INSTALLATION
7 |
|
|
| veritcal track | |
|
|
|
| ||
| Vertical Track |
| fLAGANGLE |
| BOTTOM SECTION |
Tools Needed: | IMPORTANT: The tops of the |
| 5/16” x |
|
|
3/16” Drill Bit | vertical tracks must be level |
|
|
| |
from side to side. If the bottom |
| LAG SCREWS |
|
| |
|
|
|
|
| |
Power Drill | section was shimmed to level it. |
|
| roller | 5/8” |
The vertical track on the shimmed |
|
| |||
|
|
|
| ||
7/16” Socket | side, must be raised the height of |
|
|
|
|
the shim. |
|
|
|
| |
Driver |
| VERTICAL |
|
| |
|
|
|
| ||
| Position the left hand vertical track |
| TRACK |
|
|
Tape Measure |
| ASSEMBLY |
| LAG | |
assembly over the rollers of the bottom |
|
|
| SCREW | |
|
|
|
| ||
Level | section. Make sure the counterbalance |
|
|
| locations |
cable is located between the rollers and |
|
|
|
| |
|
|
|
|
| |
| the door jamb. Drill 3/16” pilot holes |
|
|
|
|
| for the lag screws. Loosely fasten |
|
| Quick install and fully adjustable | |
| jamb brackets and flagangles to the |
|
| flagangle lag locations | |
| jamb using 5/16” x | JAMB |
| quick install | |
| Tighten lag screw securing bottom | BRACKET | BOTTOM | jamb bracket | |
| jamb bracket to jamb, to maintain 5/8” |
|
|
| |
|
| SECTION |
|
| |
| spacing. Repeat for the right side. |
|
|
| |
|
|
|
|
|
lag
screw
Please Do Not Return This Product To The Store. Contact your local | 15 |
To find your