13 | Top Section | |
| ||
Tools Needed: | Place the top section in the opening and | |
Hammer | vertically align with lower sections. | |
| ||
Nail | Temporarily secure the top section by | |
driving a nail in the header near the | ||
| ||
Power Drill | center of the door and bending it over | |
the top section. | ||
7/16 Socket | Now flip up the hinge leaf against | |
Driver | section, fastening center hinges first and | |
| end hinges last. |
NAIL | door width | |
|
INSTALLATION
14 | Vertical Track |
|
|
|
|
| |
Tools Needed: | When installing a door with a |
|
|
Power Drill | TorqueMaster® counterbalance system, |
|
|
vertical track alignment is critical. |
|
| |
|
|
| |
7/16 Socket | Position flagangle between |
|
|
Driver | (43 mm) to |
|
|
Tape Measure | edge of the door. Tighten the bottom lag |
|
|
screw. Flagangles must be parallel to the |
|
| |
| door sections. Repeat for opposite side. |
|
|
| IMPORTANT: THE DIMENSION BETWEEN |
|
|
| THE FLAGANGLES MUST BE DOOR |
|
|
| WIDTH PLUS |
|
|
| (89 MM) FOR SMOOTH, SAFE DOOR |
|
|
| OPERATION. |
|
|
| Complete the vertical track installation | FLAGANGLE | |
|
| ||
| by securing the center jamb bracket(s) | vERTICAL tRACK |
|
| and tightening the other lag screws. |
| |
| ROLLER |
| |
| Push the vertical track against the rollers | top section | |
| so that the rollers are touching the |
| |
|
|
| |
| deepest part of the curved side of the |
|
|
| track (see illustration). Tighten all the |
|
|
| track bolts and nuts. Repeat for opposite | ROLLER Against |
|
| side. |
| |
| VERTICAL TRACK |
| |
|
|
|
19