Wayne-Dalton 46 Installation, Attaching Fully Adjustable, Flagangle to Vertical Track

Models: 46

1 38
Download 38 pages 21.46 Kb
Page 11
Image 11
INSTALLATION

IMPORTANT: read instructions titled “p4” “door removal” on page 9 and “P5” “preparing the opening” on page 10 before attempting door installation.

IMPORTANT: Stainless steel or PT 2000 coated lag screws MUST be used when installing center bearing brackets, end bearing brackets, jamb brackets, operator mounting/support brackets and disconnect brackets on treated lumber (preservative-treated). Stainless steel lag screws are NOT necessary when installing products on UNTREATED lumber.

NOTE: It is recommended that 5/16 x 2” lag screws be pilot drilled using a 3/16” drill bit, and 1/4 x 2” lag screws and 1/4 x 1-1/2” lag screws be pilot drilled using a 1/8” drill bit, prior to fastening.

INSTALLATION

 

 

1

Attaching Fully Adjustable

 

Flagangle to Vertical Track

 

 

Tools Needed:

NOTE: If you have riveted track, skip

None

this step.

 

 

Hand tighten the flagangle to the

 

vertical track using (2) 1/4”- 20 x 5/8”

 

carriage bolts and (2) 1/4”- 20 flange

 

hex nuts. Secure the flange nuts after

 

flagangle spacing is complete (Step 14).

Fully Adjustable

flagangle Attaching Fully Adjustable

(2)1/4”- 20 flange hex

nuts

(2)1/4”- 20 x 5/8” carriage bolts

vertical

track

11

Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your

local yellow pages/business listings or go to the Find a Dealer section online at www.wayne-dalton.com

Page 11
Image 11
Wayne-Dalton 46 installation instructions Installation, Attaching Fully Adjustable, Flagangle to Vertical Track