� | Trolley Operator |
| |
Tools Needed: | WARNING |
Tape Measure | OPERATOR MUST BE TESTED |
| AT TIME OF INSTALLATION AND |
Power Drill | MONTHLY THEREAFTER TO |
7/16” Socket | ENSURE THAT DOOR REVERSES |
ON CONTACT WITH 2 X 4 BOARD | |
Driver | LAID FLAT UNDER THE DOOR. |
| FAILURE TO ADJUST OPERATOR, |
| IF NECESSARY, CAN RESULT IN |
| SEVERE OR FATAL INJURY. IF |
| YOUR OPERATOR IS EQUIPPED |
| WITH A PHOTOELECTRIC EYE |
| SYSTEM, THEN THIS MUST |
| BE TESTED AT THE SAME |
| TIME TO ENSURE THAT DOOR |
| DOES NOT CLOSE AND A |
| CLOSING DOOR OPENS IF |
| PHOTOELECTRIC EYE SYSTEM IS |
| OBSTRUCTED. FAILURE TO MAKE |
| ADJUSTMENTS, IF NECESSARY, |
| CAN RESULT IN SEVERE OR FATAL |
| INJURY. |
| 1. Install operator rail 1/2” to |
| (13 - 38 mm) above high arc of top |
| section of the door. |
| 2. Mount operator to ceiling so that |
| 1” to |
| clearance is maintained between |
| trolley rail and top section when |
| door is fully open (trolley rail will |
| slope down towards rear). |
| 3. Attach door arm to operator |
| bracket. |
| 4. Attach operator rail to suitable |
| mounting surface 2x6 lumber |
| minimum. |
| 5. Attach operator to ceiling using |
| perforated angle. |
| IMPORTANT: perforated Angles |
| must be securely attached to |
| sound framing member(s). |
OPERATOR RAIL
SUITABLE MOUNTING
SURFACE 2X6
LUMBER MINIMUM
HEADER
DOOR ARM TO
OPERATOR BRACKET
perforated
OPERATORangle rail
OPERATOR
FRAMING MEMBERS
PERFORATED ANGLE
optional INSTALLATION
35
Please Do Not Return This Product To The Store. Contact your local
local yellow pages/business listings or go to the Find a Dealer section online at