3

Attaching Bracket Mount Track &

 

Bottom Section

 

 

Tools Needed:

Important: the tops of the vertical

tracks must be level from side

 

None

to side. If the bottom section was

shimmed to level it, the vertical

 

 

track on the shimmed side must be

 

raised the height of the shim.

 

Position the left hand vertical track

 

assembly over the rollers of the bottom

 

section. Make sure the counterbalance

 

cable is located between the rollers and

 

the door jamb. Drill 3/16” pilot holes into

 

the door jamb for the lag screws.

 

Loosely fasten vertical track assembly

 

to the jamb using 5/16” x 1-5/8” lag

 

screws. Tighten the bottom lag screw to

 

jamb, to maintain 3/8” to 5/8” spacing as

 

shown between the bottom section and

 

vertical track. The other lag screws will be

 

tightened in step, Top Section.

 

Repeat for other side.

 

Stack the bottom section into position by

 

hooking the left hand roller into the left

 

hand vertical track, as shown in FIG. 1.

 

NOTE: Adjust the spacing of the vertical

 

tracks from 3/8” - 5/8” spacing at the

 

bottom section and 1-11/16” to 1-3/4”

 

spacing at the top section.

 

NOTE: Hang the counterbalance cables

 

over the top of the flagangles as shown.

Wood Jamb

fIG 1

Counterbalance

Cable

Fig 1

Stack the section into position, by hooking the left hand roller into the vertical track and repeating for the right hand side.

INSTALLATION

9

Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your

local yellow pages/business listings or go to the Find a Dealer section online at www.wayne-dalton.com

Page 9
Image 9
Wayne-Dalton 8850 installation instructions Bottom Section