6 | Bottom Section | |
| ||
|
| |
Tools Needed: | Center the bottom section in the door opening. | |
| ||
Level | Level section using wooden shims (if necessary) | |
under the bottom section. | ||
| ||
Wooden shims |
| |
(If necessary) |
|
| OPENING |
DOOR | SEAL |
WEATHER | |
WITH |
|
LEVEL
BOTTOM
SECTION
WOODEN SHIMS (IF NECESSARY)
7 | Vertical Track | |
| ||
|
| |
Tools Needed: | IMPORTANT: THE TOPS OF THE | |
3/16” Drill Bit | VERTICAL TRACKS MUST BE LEVEL | |
FROM SIDE TO SIDE. IF THE BOTTOM | ||
| SECTION WAS SHIMMED TO LEVEL IT. | |
Power Drill | THE VERTICAL TRACK ON THE SHIMMED | |
| SIDE, MUST BE RAISED THE HEIGHT OF | |
7/16” Socket Driver | THE SHIM. | |
Tape Measure | Position the left hand vertical track assembly | |
over the rollers of the bottom section. Make sure | ||
| ||
Level | the counterbalance cable is located between the | |
rollers and the door jamb. Drill 3/16” pilot holes for | ||
| ||
Step Ladder | the lag screws. | |
| ||
| Loosely fasten jamb brackets and flagangle to the | |
| jamb using 5/16” x | |
| lag screw securing bottom jamb bracket to jamb, | |
| maintaining 3/8”- 5/8” track spacing. | |
| NOTE: Hang cable drum over flagangle. | |
| Repeat for the right hand side. | |
|
|
JAMB
BRACKET
FLAGANGLE
VERTICAL
TRACK
ASSEMBLY
5/16” X 2”
LAG SCREWS
BOTTOM
SECTION
VERTICAL TRACK
ROLLER BOTTOM SECTION
3/8”-5/8”
LAG | LAG | |
SCREW | ||
SCREW | ||
LOCATIONS | ||
LOCATIONS | ||
| ||
12R QI FLAGANGLE | 15R QI FLAGANGLE | |
| QUICK INSTALL | |
| JAMB BRACKET | |
LAG |
| |
SCREW |
| |
LOCATIONS |
| |
| LAG | |
12R & 15R FULLY | SCREW | |
ADJUSTABLE FLAGANGLE |
|
11
Please Do Not Return This Product To The Store. Contact your local
local yellow pages/business listings or go to the Find a Dealer section online at