10 | Top Section | |
| ||
|
| |
Tools Needed: | Place the top section in the opening and vertically | |
Hammer | align with lower sections. | |
| ||
Nail | Temporarily secure the top section by driving a | |
nail in the header near the center of the door and | ||
| ||
Tape Measure | bending it over the top section. | |
| ||
Step Ladder | Now flip up hinge leaf against section, fastening | |
center hinges first, and end hinges last. (Refer to | ||
| ||
| Step 8). | |
| When installing a door with Torquemaster® Plus | |
| counterbalance system, vertical track alignment | |
| is critical. | |
| Position flagangle between | |
| to | |
| Tighten the bottom lag screw. Flagangles must be | |
| parallel to the door sections. | |
| Repeat for opposite side. | |
| IMPORTANT: THE DIMENSION | |
| BETWEEN THE FLAGANGLES MUST BE | |
| DOOR WIDTH PLUS | |
|
| |
| DOOR OPERATION. | |
| Now complete the vertical track installation by | |
| securing the center jamb bracket (s), flagangle, | |
| and connection of the vertical track/ flagangle. | |
| Repeat for opposite side. | |
|
|
Door width +
NAIL
TOP SECTION
1-11/16” TO 1-3/4”
TOP | FLAGANGLE |
SECTION
13
Please Do Not Return This Product To The Store. Contact your local
local yellow pages/business listings or go to the Find a Dealer section online at