2Attaching Fully Adjustable Flagangle
to Vertical Track
Tools Needed: | NOTE: If quick install flagangles were installed in |
None | Step 1, skip this step and continue with Step 3. |
| |
| Hand tighten the flagangle to the vertical track |
| using (1) stud plate and (2) 1/4” - 20 flange hex |
| nuts. Repeat for other side. |
| Secure the flange nuts after flagangle spacing is |
| complete (Step 10). |
Fully adjustable flagangle
(2) 1/4”- 20 Flange | Stud plate |
hex nuts |
|
Vertical track
3 |
| Hole | Tabs | Horizontal angle |
Horizontal Angle |
| |||
|
|
| ||
|
|
| Key hole slot | |
Tools Needed: | Position the horizontal angle as shown. |
|
|
|
Hammer | Place tabs of horizontal angle in the key slot of | Hole |
|
|
|
|
|
| |
| horizontal track. Using a hammer, tap the horizontal |
|
|
|
| angle towards the curved end of the track until the |
|
|
|
| holes in track and angle are aligned. Repeat for |
|
| Horizontal track |
| opposite side. Set tracks aside. |
|
| |
|
|
|
| |
| NOTE: For larger doors, a full length horizontal angle | Horizontal angle |
| |
| may be spot welded to the horizontal track. If the |
| ||
|
|
|
| |
| horizontal angle is not welded, the horizontal angle |
|
|
|
| must be installed as shown. |
|
|
|
|
|
|
| Horizontal angle |
|
|
| Horizontal track |
|
|
|
|
| Horizontal track |
|
|
|
| Tabs |
8
Please Do Not Return This Product To The Store. Contact your local
local yellow pages/business listings or go to the Find a Dealer section online at