Wayne-Dalton 9300 Installation, Right Side Shown, Hole, MIDDLE HOLE 1ST SET HOLES BOTTOM HOLE

Models: 9300

1 28
Download 28 pages 41.25 Kb
Page 9
Image 9
RIGHT SIDE SHOWN

4Installing Q.I. Jamb Brackets

Tools Needed:

Measure the length of the vertical tracks. Using

Tape Measure

the jamb bracket schedule, determine the

placement of the jamb brackets for your door

 

 

height and track type.

 

To install the jamb brackets, align the twistlock tab

 

on the quick install jamb bracket with the quick

 

install feature in the track and turn the bracket

 

perpendicular to the track so the mounting flange

 

is toward the back (flat) leg of the track.

LEFT SIDE SHOWN

RIGHT SIDE SHOWN

TWISTLOCK TAB

 

3RD SET HOLES

 

2ND SET

TOP

HOLES

HOLE

 

MIDDLE

HOLE

1ST SET

HOLES

BOTTOM

HOLE

QUICK INSTALL FEATURE

VERTICAL TRACK

JAMB BRACKET SCHEDULE

DOOR

TRACK

1ST SET

2ND SET

3RD SET

 

 

 

 

 

 

HEIGHT

LENGTH

JAMB BKT

POSITION

JAMB BKT

POSITION

JAMB BKT

POSITION

 

 

 

 

 

 

 

 

 

 

6’5”

69”

QIJB - 3

BOTTOM

QIJB - 6

MIDDLE

NOT APPLICABLE

(1753 mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

7’0”

76”

QIJB - 3

BOTTOM

QIJB - 7

TOP

NOT APPLICABLE

(1930 mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

8’0”

88”

QIJB - 3

MIDDLE

QIJB - 7

TOP

QIJB - 8

MIDDLE

4 SECTIONS

( 2235 mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

8’0”

88”

QIJB - 3

BOTTOM

QIJB - 7

TOP

QIJB - 8

TOP

5 SECTIONS

(2235 mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

INSTALLATION

9

Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your

local yellow pages/business listings or go to the Find a Dealer section online at www.wayne-dalton.com

Page 9
Image 9
Wayne-Dalton 9300 Installation, Right Side Shown, Hole, MIDDLE HOLE 1ST SET HOLES BOTTOM HOLE, Jamb Bracket Schedule