GOLD CGi
3d Venting — direct exhaust — vent starter
1.Select a vent pipe manufacturer and obtain all vent components needed, based on boiler location and venting method.
2.You must use the vent starter made by the vent pipe manufacturer. See separate CGi, CGs & GV Vent Component Supplement, for part number of each component, listed by vent manufacturer.
Use only the vent starter of the same manufacturer as the vent compo- nents. Do not mix components from different systems. The vent system could fail, causing flue gas spillage, resulting in severe personal injury or death.
3.Follow all applicable national, state, local or provin- cial codes when venting the CGi boiler.
4.Connect vent starter to blower housing outlet as shown in the Figures 8 through 11.
a.Do not mix components from different vent manufacturers.
b.Maintain minimum 2” clearance from com- bustible materials to vent pipe.
c.Seal with sealant specified by vent pipe manufacturer, using ³⁄₈" bead (not required for FasNSeal™).
d.Tighten strap at band clamp screw until strap is snug around blower housing.
Figure 8 | Figure 10 |
FasNSeal™ | |
ventstarter | vent starter |
Figure 9 | Figure 11 |
|
|
vent starter | vent starter |
16 | Part Number |
|