GOLD CGi
11c Troubleshooting — control module lights (cont.)
CHART 4 — FLAME & POWER lights flashing
— Usually indicates flame sensed when it shouldn't be there —
Electrical shock hazard — Wherever you see TURN OFF POWER , follow the instructions. Failure to follow instructions could result in severe personal injury, death or substantial property damage.
Are manual main shutoff valve and gas valve open?
No
Yes
• Leave main manual gas valve closed. |
|
|
| • Turn off power to the boiler at service switch or breaker. | ||||
|
|
| • Wait at least 45 seconds. |
|
| |||
• Turn off power to boiler at service switch or breaker. |
|
|
| |||||
| • Turn on power to boiler. |
|
| |||||
• Wait at least 45 seconds. |
|
|
|
|
| |||
|
|
| • Restart boiler, following Operating instructions in this | |||||
• Turn on power to boiler. |
|
|
| |||||
|
|
| manual (Section 9c). |
|
| |||
• Restart boiler, following Operating instructions in this |
|
|
| |||||
| • Look through the pilot inspection port to see if the pilot is | |||||||
manual (Section 9c). |
|
|
| |||||
|
|
| burning during the prepurge period (first 30 seconds of | |||||
Do FLAME and POWER lights still flash? |
| |||||||
| operation). |
|
| |||||
|
|
|
|
|
| Is pilot burning during prepurge period? | ||
No |
|
| Yes |
| ||||
|
|
|
|
|
| No |
| Yes |
|
|
|
|
|
|
|
|
|
•Replace control module.
•Retest.
|
|
| • Allow boiler to continue cycling. |
| • | Replace gas valve. |
|
|
|
| |||||||
|
|
|
| • | Retest boiler. |
|
|
|
| ||||||||
|
|
|
| Are FLAME & POWER lights flashing? |
|
|
|
|
| ||||||||
|
|
|
|
|
| Are FLAME and POWER lights flashing? | |||||||||||
|
|
|
|
|
|
|
|
|
|
|
| ||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| No |
|
| Yes |
|
| No |
|
| Yes | ||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
• | TURN OFF POWER |
| • | Boiler may now be |
| • | Replace control |
| • | Boiler should now |
| • | Replace control | ||||
|
| operating |
|
| module. |
|
| operate normally. |
|
| module. | ||||||
| to boiler at service switch |
|
|
|
|
|
|
|
| ||||||||
|
|
| normally. |
|
|
|
|
|
|
|
|
|
|
|
| ||
| or breaker. |
|
|
| • | Retest. |
| • | Original flashing |
| • | Retest. | |||||
|
|
|
|
|
|
|
| ||||||||||
• | Open main manual gas |
| • | Perform |
|
|
|
|
|
| FLAME light |
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
| |||||||
| valve. |
|
| procedures in |
|
|
|
|
|
| caused by gas |
|
|
|
| ||
• Turn on power to boiler |
|
| boiler manual to |
|
|
|
|
|
| valve not |
|
|
|
| |||
| at service switch or |
|
| verify proper |
|
|
|
|
|
| operating properly. |
|
|
|
| ||
| breaker. |
|
| operation. |
|
|
|
|
| • | See normal |
|
|
|
| ||
• Restart boiler per lighting |
|
|
|
|
|
|
|
|
|
|
|
|
| ||||
| instructions. |
|
|
|
|
|
|
|
|
|
| sequence of |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||
• | Perform |
|
|
|
|
|
|
|
|
|
| operation, |
|
|
|
| |
| procedures in boiler |
|
|
|
|
|
|
|
|
|
| Figure 30, |
|
|
|
| |
| manual to verify proper |
|
|
|
|
|
|
|
|
|
| page 37. |
|
|
|
| |
| operation. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
54 | Part Number |
|