Manuals
/
Weil-McLain
/
Household Appliance
/
Boiler
Weil-McLain
550-110-710/0107 manual 9c Operating instructions CGi-25to CGi-6
Models:
550-110-710/0107
1
40
68
68
Download
68 pages
51.13 Kb
37
38
39
40
41
42
43
44
<
>
Troubleshooting
Install
Error codes
9b Operation — wiring diagrams
2a Prepare boiler — placement & setup
Dimension
Maintenance
Connecting gas supply piping to boiler
Reported problems
Section assembly
Page 40
Image 40
GOLD CGi
Gas-Fired
Water Boiler — Boiler Manual
9c
Operating instructions
CGi-25
to
CGi-6
• Spark pilot • Natural or propane gas
• Gas valve: Honeywell VR8204/VR8304
40
Part Number
550-110-710/0107
Page 39
Page 41
Page 40
Image 40
Page 39
Page 41
Contents
• Installation • Maintenance
• Startup • Parts
GOLD CGi
Boiler Manual
How it works
GOLD CGi Gas-FiredWater Boiler - Boiler Manual
④Air pressure switch
⑤Water temperature limit switch
GOLD CGi Gas-Fired Induced-DraftWater Boiler
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
Contents
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
Please read before proceeding
Installer
When servicing boiler —
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
1a Prepare boiler location — codes & checklist
Installations must follow these codes
GOLD CGi Gas-FiredWater Boiler - Boiler Manual
Before locating the boiler, check the following
1b Prepare boiler location — clearances
Recommended SERVICE clearances
Residential garage installations
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
1c Prepare boiler location — vent system
Chimney or vent require- ments
1d Prepare boiler location - air contamination
GOLD CGi Gas-FiredWater Boiler - Boiler Manual
1e Prepare boiler location — air openings
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
Air openings must be provided
Air opening options
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
Exhaust fans and air movers
Motorized air dampers
Single air opening option
2a Prepare boiler — placement & setup
Orifice replacement procedure
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
Place boiler/crate near position
2b Prepare boiler — pressure test
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
Hydrostatic pressure test
Drain and remove fittings
3a Venting - general information
Venting — chimney draft venting
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
Chimney draft venting
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
3c Venting — Direct exhaust — components
Obtain vent system components
3d Venting — direct exhaust — vent starter
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
3e Venting — direct exhaust — termination
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
3f Venting — direct exhaust — installation
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
3f Venting — direct exhaust — installation cont
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
in substantial property damage
Sidewall termination
4a Water piping — general information
Pressure/temperature gauge
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
General piping information
4b Water piping — single-zonesystem
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
Closed-typeexpansion tank
Figure
4c Water piping — multiple zones
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
Piping multiple zones
Converted gravity or steam systems
4c Water piping — multiple zones continued
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
4d Piping — low temperature systems
Temperature gauges
Valve adjustment
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
4d Piping - low temperature systems continued
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
4d Piping — low temperature systems
Valve adjustment
Temperature gauges
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
4d Piping — low temperature systems continued
1Boiler isolation balancing valves
4d Piping — low temperature systems
Valve adjustment
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
SYSTEM-bypasspiping method
4e Water piping — refrigeration system
4d Piping — low temperature systems continued
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
Prevent chilled water from entering boiler
5 Gas piping
Connecting gas supply piping to boiler
GOLD CGi Gas-FiredWater Boiler - Boiler Manual
Natural Gas
6 Field wiring
Electrical installation must comply with
Wiring connections
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
7a Start-up— preparation
Freeze protection when used
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
Check for gas leaks
7a Start-up— preparation continued
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
Fill the system with water
Inspect system water piping
7b Start-up— operate boiler
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
Start the boiler
Check system and boiler
7b Start-up— operate boiler continued
7c Start-up- if boiler doesn’t start
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
Pilot burner flame Figure
Installation and service certificate
8 Check-outprocedure — checklist
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
9a Operation — sequence
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
Figure 31 Schematic wiring diagram
9b Operation — wiring diagrams
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
Figure 32 Ladder wiring diagram
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
9c Operating instructions CGi-25to CGi-6
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
• Spark pilot • Natural or propane gas
• Gas valve: Honeywell VR8204/VR8304
9c Operating instructions CGi-25to CGi-6
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
Spark pilot Natural or propane gas
• Gas valve: White-Rodgers36E
9c Operating instructions CGi-25to CGi-8
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
• Spark pilot • Natural or propane gas
• Gas valve: White-Rodgers36C
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
10a Service and maintenance — schedule
VERIFY PROPER OPERATION AFTER SERVICING
10b Service and maintenance — annual start-up
Inspect
Reported problems
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
10b Service & maintenance – annual start-up cont
Service
Start-up
Inspect
Check/test
10b Service & maintenance – annual start-up cont
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
Gas piping
Cleaning boiler heating surfaces
10b Service & maintenance – annual start-up cont
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
Review with owner
11a Troubleshooting — procedure
11b Troubleshooting — components
Check pressure switch setting
Troubleshooting air pressure reading
11b Troubleshooting — components continued
Control indicator lights —
Troubleshooting the control module
Control indicator lights — LOCKOUT modes
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
11b Troubleshooting — components continued
Figure 38 Control module connections
11c Troubleshooting — control module lights
Is POWER light off?
Is POWER light
Is POWER light flashing now?
11c Troubleshooting — control module lights cont
CHART 2 — TSTAT CIRC & POWER lights flashing
Do the TSTAT and POWER lights still flash?
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
11c Troubleshooting — control module lights cont
CHART 3 — PRESS SWITCH & POWER lights flashing
Is PRESS SWITCH light flashing?
Does the ohmmeter indicate the switch is closed?
11c Troubleshooting — control module lights cont
Do FLAME and POWER lights still flash?
Are FLAME & POWER lights flashing?
Are FLAME and POWER lights flashing?
11c Troubleshooting - control module lights cont
Does the ohmmeter indicate the switch is closed?
Is PRESS SWITCH light flashing?
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
11c Troubleshooting — control module lights cont
TURN OFF POWER
TURN OFF POWER
TURN OFF POWER to boiler
11c Troubleshooting — control module lights cont
Are limit switch contacts closed?
Does voltmeter show 120 VAC across pins?
Are limit switch contacts
12a Replacement parts
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
Figure 39 Section assembly
12b Replacement parts — section assembly
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
Figure 40 Base assembly
12c Replacement parts — base
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
12c Replacement parts — base continued
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
Item
Description
Figure 41 Jacket assembly
12d Replacement parts — jacket
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
12d Replacement parts — jacket continued
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
12e Replacement parts — trim
Figure 42 Trim assembly
Fittings shown are factory-installedon boiler
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
Figure 43 Gas control assembly
12f Replacement parts - controls
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
Figure 44 Dimensional drawing
13a Dimensions
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
13b Ratings
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
Handling ceramic fiber and fiberglass materials
GOLD CGi Gas-FiredWater Boiler — Boiler Manual
REMOVAL OF COMBUSTION CHAMBER
LINING OR BASE PANELS