GOLD CGi
4d Piping — low temperature systems (continued)
Figure 20 | Primary/secondary piping | Figure 21 | Primary/secondary piping |
| Zoning with circulators |
| Zoning with zone valves |
1Boiler isolation (balancing) valves
2Flow/check valve
3System or zone circulator
4System temperature gauges
5Zone valve
6Drain valve
7System temperature valves (see instruc- tions to the left for adjusting valves)
8Blend temperature gauge
9Relief valve
10Automatic air vent (with
11Fill valve
12
13Air separator and automatic vent, if used (Note that the fill valve must always be connected to the expansion tank, regardless of location of expansion tank, circulator or air separator.)
Part Number | 25 |
|