GOLD CGi
2a Prepare boiler — placement & setup
Place boiler/crate near position
1.Leave boiler in crate and on pallet until installation site is ready.
2.Move entire crate and pallet next to selected location.
3.Remove crate.
4.Remove boiler from pallet.
Do not drop boiler or bump jacket on floor or pallet. Damage to boiler can result.
a.Tilt left side of boiler up and place a board under left legs.
b.Tilt boiler the other way and place a board under right legs.
c.Slide boiler backward off pallet and into position.
5.Check level.
a.Shim legs, if necessary.
b.Do not alter legs.
Inspect orifices and burners
1.Remove front jacket door. Remove burner shield (see Figure 40, item 4, page 60).
2.Check for
3. Reinstall burner shield.
Do not operate boiler without burner shield in place. Failure to do so could result in severe personal injury, death or sub- stantial property damage.
Orifice replacement procedure
(when required)
1.Remove the screws securing the burner shield and remove burner shield.
2.Using a 7/16”
3.Apply a small amount of pipe dope to each of the new orifices and install in the manifold us- ing a 7/16”
Use only pipe dope compatible with propane gas, even if boiler is to be operated on natural gas. Failure to comply could result in severe personal injury, death or substantial property dam- age.
4.Carefully replace the burner shield.
5.Follow the
Table 2 Manifold orifice sizing at sea level and altitudes to 4,500 feet
12 | Part Number |
|