Windsor CS24SP 10060220 manual Maintenance-Transporting, 4-28, Pushing Machine, Machine Tie-Downs

Models: CSXE24 10060290 CS24SP 10060220 CSX24 10060270 CSE24 10060250 CS24 10060210 CSE24SP 10060260 CSXEO24 10060300

1 61
Download 61 pages 38.1 Kb
Page 55
Image 55
PUSHING MACHINE

PUSHING MACHINE

The machine may be pushed for short distances at speeds not to exceed 5 mph. Be careful to avoid damaging machine. The machine may be pushed by hand from the rear.

NOTE: To avoid damage caused by regenerative voltage, disconnect traction motor before towing or pushing machine.

MACHINE TIE-DOWNS

There are two tie points located at front and each side of foot box frame and two at the front side of frame. Tie-down devices must be of the proper type and strength. The combined strength of all tie-downs must be strong enough to lift two times the weight of the machine. Tie-downs must be positioned to prevent the machine from moving forward, backward, or either side to side. Use all four corners of the machine with the tie-downs running out opposite directions. Tie- downs must be attached to the transporting vehicle securely.

TIE DOWN POINTS

MAINTENANCE-TRANSPORTING

PREPARATION FOR LOADING /UNLOADING TRAILER

Before loading or unloading machine from trailer, remove squeegee, scrub deck, side skirts or side squeegees, Aqua-Mizers and scrub brushes (pads) to eliminate interference with tie-downs. Scrub head must be in the up position before loading.

NOTE: When transporting the machine on a trailer or in a truck, in addition to using tie-downs, be sure to set the parking brake, and block the tires to prevent the machine from rolling.

86037660 CHARIOT 11/09/06

4-28

Page 55
Image 55
Windsor CS24SP 10060220, CSE24 10060250, CSXE24 10060290 Maintenance-Transporting, 4-28, Pushing Machine, Machine Tie-Downs