Installation

Preparing for the Installation

Important: Before installing the Long AC Conduit Box, read all instructions and cautionary markings located in this guide and in your inverter manual.

Code Compliance

Governing installation codes vary depending on the location and type of installation. Electrical installations must meet local and national wiring codes. Installations of this equipment should only be performed by skilled personnel such as qualified electricians and Certified Renewable Energy (RE) System Installers. For a list of Xantrex Certified RE dealers, please visit our website at www.XantrexREdealers.com.

Important: Be sure to obtain the appropriate permits, if necessary, prior to starting this installation.

Installation Tools and Materials

Tools Required

Hardware / Materials Required

The following tools may be required for installing this equipment:

Wire strippers

Assorted open-end wrenches or socket wrench and fittings

Torque wrench

Electrical tape

Multimeter (AC/DC volts, frequency)

Assorted Phillips screw drivers

Allen/Hex head driver set

Slotted screw driver

Level

Pencil

Utility knife

The following materials may be required for completing this installation:

Conduits (flexible conduit is recommended), bushings, wire nuts, and appropriate fittings for wire runs

Electrical wire of appropriate size and length

Breaker panels (if used)

Additional circuit breakers (if required)

Ground busses, bars, and/or rods

Six appropriately sized wood screws or lag bolts and washers

2–2

973-0031-01-01 Rev A

Page 24