Pre-Installation

Ventilation Requirements

Minimum clearance for ventilation around the Long AC Conduit Box must be at least 12 inches (305 mm) at the top, the ends, and in front. This clearance is needed to prevent recirculating hot air from the inverter’s exhaust (DC side) from going back into the inverter’s intake (AC side).

Please refer to the Sine Wave Plus Inverter/Charger Owner’s Guide for additional location considerations.

12" (305 mm) Required

12"

(305 mm)

Shock Hazard Warning Label

WARNING

ELECTRICAL SHOCK

HAZARD

THIS ELECTRICAL SYSTEM IS EQUIPPED WITH A DC TO AC POWER INVERTE R. DISCONNECT THE

DC AND AC SOURCES BEFORE SERVICING.

Figure 2-2Clearance Requirements for Ventilation

973-0031-01-01 Rev A

2–5