Mounting
973-0031-01-01 Rev A 2–13
Mounting on Plywood
To mount the Long AC Conduit Box on plywood:
1. With the help of another person, lift the inverter and mount it into place.
Secure it to the plywood with #10 wood screws (14 total - length to penetrate
1½ inches or more into the studs.) See the Sine Wave Plus Inverter/Charger
Owner’s Manual for more specific mounting instructions for the inverter.
2. Line up the Long AC Conduit Box at the AC end of the inverter, so that the
mounting rails are aligned together and the Long AC Conduit Box base is as
close to the inverter as possible. The gap between the Long AC Conduit Box
and the inverter should be no more than 1/16 inch.
3. Secure the Long AC Conduit Box in place with six #10 wood screws of an
appropriate length (or lag bolts) in the six mounting and keyhole slots on the
mounting rails of the ACCB. Bias the screws away from the inverter.
4. Leave the top cover off the Long AC Conduit Box to proceed with wire
connections.
Important:
Ensure that the factory-installed cables in the Long AC Conduit Box are
not pinched, crushed, removed, or damaged during the installation to the inverter.
Figure 2-10
Installing the ACCB-L to the SW Plus Inverter on Plywood
ACCB-L Base with
top cover removed
Mounting holes
and keyhole slots
for ACCB-L (x6)
Align Mounting Rails
Plywood
Bias the screws
(top and bottom)
away from the inverter
for easier servicing if
necessary