SECTION 3
INSTALLATION AND INITIAL
(+) terminal. The value should be the same as at the PV array string disconnect switch. It should also be positive.
•Open all PV string disconnect switches.
•Close the isolation transformer circuit breaker.
•Verify 208 VAC voltage across the AC disconnect switch. If a phase rotation meter is available, verify proper phase rotation at the AC disconnect switch.
•Close the AC disconnect switch.
•Verify 208 VAC voltage across the AC line fuses
System Verification
•Upon applying 208 VAC power to the
•Remedy any faults reported. To clear a fault condition, press the <ENTER> key twice. If the fault message does not change, the fault condition is still present. Most likely, any faults seen at this point will be related to
•Scroll up the menu until ‘Enter Read Parameter:’ is displayed.
•Press <Enter>, then <19>. This is line voltage frequency being read by the PCU. It should read 60.0 +0.5,
•Verify the On/Off switch is in the ‘Off’ position.
•Close the PV array string disconnect switches.
•Close the
•Press <F2> on the operator interface panel. If the PV voltage is above the PV Start Voltage setpoint, the second line should read ‘Waking Up’. Once the PV Start Time is exceeded, the
•The power tracker was previously limited to 25% of
•Scroll to ‘Enter Read Parameter:’ Press <ENTER> then <17> <ENTER> to view ground fault current value. This value should be equal to or very close to zero. Continue to monitor this value as the
•Enter the write parameter menu and increase the ‘I PPT Max %’ to 50. Exit the write parameter menu and verify all operating values are proper.
•Continue to increment ‘I PPT Max %’to 100. Depending upon solar conditions, the
•The