SECTION 3
INSTALLATION AND INITIAL TURN-ON
PV-225208 Photovoltaic Inverter
Operation and Maintenance Manual
Copyright 2003, Xantrex Technology Inc.
DOCUMENT: 151811 3-8
Power Tracker Fine Tuning:
All PV-225208 operating parameters have been set at the factory, based upon prior experience with PV
arrays. Contact your Xantrex Technology distributor for further information.
It is recommended that the PV-225208 be watched during Wake-Up and Sleep Test. If the PV-225208
cycles between operating and sleeping at either of these times, the condition setpoints are not set properly
(refer to section 4 for detailed description of PV-225208 state transitions). The PV225208 should not
cycle if the setpoints are set properly.
Some field adjustable parameters are password protected and may only be changed
by trained service technicians. In particular are parameters relating to utility pro-
tection setpoints. Any changes to these setpoints should be agreed upon by the
local utility and the equipment owner.
NOTE
Visually inspect the exterior surfaces for any damage (nicks, chips, exposed base
metal and scratches) that may have occurred during shipment or installation. Touch
up or recoat using White NISSEN Feltip Paint Marker, or equivalent to prevent
rust or corrosion.
NOTE