SECTION 3

INSTALLATION AND INITIAL TURN-ON

Power Tracker Fine Tuning:

All PV-225208 operating parameters have been set at the factory, based upon prior experience with PV arrays. Contact your Xantrex Technology distributor for further information.

It is recommended that the PV-225208 be watched during Wake-Up and Sleep Test. If the PV-225208 cycles between operating and sleeping at either of these times, the condition setpoints are not set properly (refer to section 4 for detailed description of PV-225208 state transitions). The PV225208 should not cycle if the setpoints are set properly.

NOTE

Some field adjustable parameters are password protected and may only be changed by trained service technicians. In particular are parameters relating to utility pro- tection setpoints. Any changes to these setpoints should be agreed upon by the local utility and the equipment owner.

NOTE

Visually inspect the exterior surfaces for any damage (nicks, chips, exposed base metal and scratches) that may have occurred during shipment or installation. Touch up or recoat using White NISSEN Feltip Paint Marker, or equivalent to prevent rust or corrosion.

DOCUMENT: 151811

PV-225208 Photovoltaic Inverter

3-8

 

Operation and Maintenance Manual

Copyright 2003, Xantrex Technology Inc.

Page 16
Image 16
Xantrex Technology PV-225208 important safety instructions Power Tracker Fine Tuning